We proudly announce that we have started with the preparations of our upcoming project: Campus 300 in Den Bosch, the Netherlands!

The first steps have been taken into this important milestone in creating this innovative campus for current students as well as future generations. Campus 300 will become the symbol of our joint vision on sustainability as well as modern architecture.

A big shout out to the amazing construction team: Van Wijnen Rosmalen, DP6 architectuurstudio and Avans University of Applied Sciences and their commitment and expertise. We are looking forward to a successful cooperation and creating an inspiring and futureproof campus where knowledge and innovation are combined.

Stay tuned for more updates on this exciting project!

With over six thousand square feet of Maars partition walls the Fontys University is designed into different functional spaces. EGM Architects from Dordrecht, The Netherlands designed this university witch consists into two different types of spaces. One space focused on meeting each other and one space where education is central. The architect have chosen a different appearance for both spaces.

  • The Maars partition systems contribute to both purposes of the different spaces.

One where communication and creativity is encouraged and one space which supports a innovative way of education.

We installed over four thousand square feet of String² partition walls, closed walls and bi-block window frames. And we were challenged to install another two thousand square feet of String² fire resistant walls. De main challenge in this project was installing the wall systems on top of the edge of the floor, through a loft all the way to the firth floor.

It is so inspiring to see that our flexible partition systems contributes to a space where students are stimulated to reach for their ambitions.

Klanten die u voor zijn gegaan

Sign up for the Maars Newsletter

Want to stay informed of all developments? Sign up for the Maars email newsletters.